Civil Engineering Firms

A civil engineering firm is who you call when a project needs the ground tested, the drainage worked out, or a site plan a building department will actually accept. Fees come either hourly or as a percentage of construction cost, and the percentage form is the one that catches people out: on residential work the design fee alone can run 5 to 20 percent of the build. Ask which basis you are being quoted on before anything else.

Checked Aug 2026

Cochran

Civil Engineering Firms
·
Fenton
  • Civil Engineering
  • Architecture
  • Municipal Engineering
  • Construction Services
  • +2 more
0.0
No reviews yet

What it costs

ServiceTypical
Engineering consultant, hourlyNational range$125 to $200 per hour
Structural engineer, hourlyNational range$100 to $150 per hour
Land surveyNational range$345 to $675 per job
Soil testing before constructionNational range$500 to $1,000 per job

Ranges last checked September 2026. They come down automatically when they are due to be rechecked.

Engineering consultant, hourly

What moves the price

  • Whether the firm holds the license or an individual does
  • Complexity of the site, with slope, water and poor soil all adding hours
  • Whether drawings have to be stamped for a permit
  • Revisions requested by the building department

Usually included

  • The engineer time, and the drawings produced from it

Quoted separately

  • Construction itself
  • Building permit fees, around $1,315 on a residential project
  • Revisions after the design is approved
  • Any specialist sub-consultant brought in

Structural engineer, hourly

What moves the price

  • A short inspection with a letter is often a fixed fee instead
  • Whether the work is an assessment or a full design
  • Access to the structure being assessed
  • Travel to the site

Usually included

  • Inspection and the written finding

Quoted separately

  • Construction itself
  • Building permit fees, around $1,315 on a residential project
  • Revisions after the design is approved
  • Any specialist sub-consultant brought in

Land survey

What moves the price

  • Lot size and how overgrown it is
  • Whether existing corner markers can be found
  • How far back the deed research has to go
  • Whether a stamped plat is needed for a permit or only a sketch

Usually included

  • Field work and the survey drawing

Quoted separately

  • Construction itself
  • Building permit fees, around $1,315 on a residential project
  • Revisions after the design is approved
  • Any specialist sub-consultant brought in

Soil testing before construction

What moves the price

  • Number of bore holes the site needs
  • Depth required before firm ground is reached
  • Whether groundwater is encountered
  • Laboratory work on the samples

Usually included

  • Boring, sampling and the geotechnical report

Quoted separately

  • Construction itself
  • Building permit fees, around $1,315 on a residential project
  • Revisions after the design is approved
  • Any specialist sub-consultant brought in
How do we know these prices?

Every figure above comes from a named source we can link to, with the date we last checked it. We publish ranges rather than single prices because a range is what a provider will actually give you: the same job moves with what is being worked on, the materials, how hard it is to get at and how busy the trade is locally. Treat these as the order of magnitude to expect before you call, not as a quote.

The figures here are national. Where a source publishes figures state by state, the state pages carry that local figure instead of this one. We do not scale a national number by a multiplier of our own invention.

Every range carries a review date. When that date passes the number comes down until it is rechecked, rather than sitting here undated.

What is different about hiring an engineer

The fee basis decides everything you can compare

Engineering and design work is quoted three ways: an hourly rate, a fixed fee for a defined deliverable, or a percentage of the construction cost. Two firms quoting on different bases cannot be compared at all, and the percentage form is the one that moves most, because it rises with a budget you have not finalized yet.

Ask for the basis first and then ask what happens when the scope changes. On an hourly engagement, a request from the building department is billable time. On a fixed fee, whether it is billable depends on how tightly the deliverable was written.

The license belongs to a person, not only to the firm

Professional engineers, architects and land surveyors are licensed individually by state boards, and firms are often registered separately. That means a check has two halves: the company, and the named individual who will stamp your drawings. A stamp is a personal legal act, so the person matters as much as the letterhead.

Design and inspection under one roof is a trade-off

Larger firms hold civil design, survey, geotechnical work and construction inspection in one place, and the handoffs between those disciplines then happen internally rather than across three contracts. That is a real advantage on a complicated site.

The trade-off is worth naming before it is agreed rather than after. When the same firm both designs the work and inspects it being built, the party checking the work is the party that specified it. Owners on larger projects sometimes retain their own representative for exactly that reason.

How to choose a civil engineering firm

Start with what the building department actually requires, because that is the deliverable you are buying. A stamped site plan, a drainage calculation and a geotechnical report are three different products and not every firm produces all three.

Ask who does the work and who signs it. A firm may subcontract survey or soils to a specialist, which is normal, but you should know it before the invoice arrives with a line you did not expect.

Check the individual license as well as the firm, through the state board that issues it. Most publish a searchable register that returns status and any discipline record.

Questions to ask before you engage

  • Is this quoted hourly, as a fixed fee, or as a percentage of construction cost?
  • What exactly is the deliverable, and is it the document my building department asks for?
  • Who will stamp the drawings, and what is that person's license number?
  • Is any part of this subcontracted, and is that inside the quote?
  • What happens to the fee if the building department asks for revisions?
  • If you also inspect the construction, who is checking your own design?
  • What does the schedule look like, and what could delay it?

Common questions

How do civil engineers charge?

Three ways: an hourly rate, a fixed fee for a defined deliverable, or a percentage of the construction cost. The table above carries the current hourly and per-job ranges. Two firms quoting on different bases cannot be compared, so establish the basis before anything else.

What does a percentage-of-construction fee mean for me?

That the fee rises with a budget you may not have finalized. On residential work the design fee alone can run 5 to 20 percent of the build, which is why the basis of the quote matters more than the headline number.

Do I need a survey, a soil test, or both?

It depends what the building department asks for. A stamped site plan, a drainage calculation and a geotechnical report are three separate products, and not every firm produces all three. Ask the department first, then buy to that list.

How do I check an engineer's credentials?

Through the state board that licenses professional engineers, architects and land surveyors. Licenses are held by individuals and firms are often registered separately, so check both the company and the named person who will stamp your drawings.

Is it a problem if one firm designs and inspects?

It is a trade-off rather than a problem. Holding design, survey, geotechnical and inspection in one place removes the handoffs between them. It also means the party checking the work specified it, which is why owners on larger projects sometimes retain their own representative.